News

Innaminicka says CSG exploration well has been terminated

  •  6 November 2009
  • 0 comments
  • 35 views

INNAMINCKA Petroleum says AGL Energy, operator of the coal seam gas program for PEL 103 and PEL 103A joint ventures located in the Cooper Basin, has concluded drilling on the Merninie 2 coal seam gas exploration well.This was the first well in a three well programme.

The company says Merninie 2 was unable to reach planned total depth of 550m due to deteriorating hole conditions. Coring was terminated at a total depth of 518m. Gas was observed evolving from cores and samples have been placed in canisters to measure desorbed gas.

Merninie 2 has been plugged and abandoned and the rig has moved to the second well location, Merninie 3. Surface casing has been set and drilling is continuing ahead to core point.

The three core hole drilling programme is expected to be completed before Christmas 2009.

Add a comment

| More

Add a comment Comments

No comments found, be the first to add one.
Thank you very much.

Your comment has been submitted.

Required

Please enter your name.

Required, but never displayed.

Please enter a valid email address.

Optional, and linked if provided.

Required

Please enter your comment.

Required

Please enter the code shown on the right.
Check this box to receive the latest updates in our email newsletter.
to get Mining Coal
delivered to your inbox

Recent comments

Latest from Twitter

    Getting your tweets...